1.Check before using the tube filling and sealing machine: After the tube filling and sealing machine is installed, turn on the 220V power supply, and try to run the motor to ensure that the direction of rotation is correct, and the pressure and flow rate of the compressed air (0.5-0.6m3/min) ), check whether each motor, bearing, etc. need to be lubricated. It is strictly forbidden to operate without oil. After normal operation, the machine can be started. At the same time, observe whether the fasteners of each part are loose. After the operation of each part is stable, it can be used normally.
2.Check whether the safety features of the tube filling and sealing machine are functioning normally.
3.Before opening the tube filling and sealing machine, carefully check whether the chain plate is stuck, whether there is any debris in the conveyor belt, whether there is a tube in the pipe storage box, whether the power and air source are connected, wait for all conditions to be prepared, Restart the main power supply, the power indicator light is on, and the emergency stop indicator light is off, then the starting conditions are met, press the start button on the control box and the start switch at the filling point, and the main power supply should be turned off after shutdown.